* Favorable Prices
* Operate Easily
* Quality Guarantee
* Strictly According to the Quality Control
* Used for Power Plan
Emeishan Chicheng Machine Manufacture Co.,Ltd
--------------------------------------------------------------------------------------------------------------------------
Supply the spare part for the turbine and associated equipment considered necessary for 3 years of operation of the generating units.
The contract includes the design, manufacture, inspection and testing, packing for export shipment.
Operation and maintenance manual with :
Operating criteria
O / M manual of Turbine & Generator
O / M manual of all main equipment / components
Wiring diagram of controls and switch boards panel
Parts list and cable list
Specifications:
1.The best efficiency :85%
2. The speed:750r/min
3. The discharge(m
3
/s):4.67-8.01
4. The head(m): 34.1~100.2
Welcome to our factory:
No comments:
Post a Comment